2022-12-05 18:37 |
|
Design and Fabrication of FRESCA2 Cryostat
/ Dallocchio, Alessandro (CERN) ; Carra, Federico (CERN) ; Tabian, Iuliana (CERN) ; Masci, Marco (CERN) ; Riffaud, Benoit (CERN) ; Zuccalli, Laurent ; Maire, Vincent ; Lombardo, Davide Maria (Universita e INFN, Firenze (IT)) ; Debeux, Julien ; Rigutto, Emilien (CERN) et al.
In the framework of the High Field Magnet activities, a new FRESCA2 test station (Facility for Reception of Superconducting Cables 2) was designed and fabricated at CERN to measure superconducting cables in background magnetic fields. [...]
CERN-ACC-NOTE-2022-0050.
-
2022. - 5 p.
Full text
|
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2011-05-11 14:34 |
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2011-05-11 13:48 |
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-12-15 13:55 |
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-11-21 16:45 |
|
High Power test of a low group velocity X-band Accelerator Structure for CLIC
/ Döbert, S (CERN) ; Grudiev, A (CERN) ; Riddone, G (CERN) ; Taborelli, M (CERN) ; Wuensch, W (CERN) ; Zennaro, R (CERN) ; Fukuda, S (KEK, Tsukuba) ; Higashi, Y (KEK, Tsukuba) ; Higo, T (KEK, Tsukuba) ; Matsumoto, S (KEK, Tsukuba) et al.
In recent years evidence has been found that the maximum sustainable gradient in an accelerating structure depends on the rf power flow through the structure. [...]
CERN-AB-2008-069 ; CLIC-Note-767.
-
2008 - 4.
Preprint
|
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-10-31 14:30 |
AD Consolidation for operation beyond 2010
/ Eriksson, T (CERN)
The Antiproton Decelerator (AD), which started up for physics in 2000 and today supplies low-energy antiprotons to the ATRAP, ALPHA, ASACUSA and ACE experiments is based on the ACOL machine from which it still retains most of the components. [...]
CERN-AB-2008-068-OP.
-
2008. - 23 p.
Preprint
|
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-10-15 08:27 |
|
Plans for a Superconducting H$^{-}$ LINAC (SPL) at CERN
/ Brunner, O (CERN) ; Calatroni, S (CERN) ; Ciapala, Edmond (CERN) ; Garoby, R (CERN) ; Gerigk, F (CERN) ; Lombardi, A M (CERN) ; Losito, R (CERN) ; Parma, V (CERN) ; Rossi, C (CERN) ; Tückmantel, Joachim (CERN) et al.
As part of the upgrade of the LHC injector complex at CERN, the construction of a 4 GeV Superconducting Proton Linac (the SPL, in fact an H- accelerator) is planned to begin in 2012. [...]
CERN-AB-2008-066-BI.
-
2008. - 4 p.
Fulltext
|
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-10-07 15:49 |
|
Intensity Upgrade Plans for CERN-LHC Injectors
/ Shaposhnikova, Elena (CERN)
With LHC coming into operation very soon an upgrade plan for the whole CERN accelerator complex has been proposed to allow full exploitation of the LHC potential in the future as well as giving increased support to traditional and possible new experiments at lower beam energies. [...]
CERN-AB-2008-065.
-
2008. - 7 p.
Full text
|
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-10-07 11:15 |
|
Choice of Frequency, Gradient and Temperature for a Superconducting Proton Linac
/ Gerigk, F (CERN) ; Brunner, O (CERN) ; Calatroni, S (CERN) ; Ciapala, Edmond (CERN) ; Eshraqi, M (CERN) ; Garoby, R (CERN) ; Lombardi, A M (CERN) ; Losito, R (CERN) ; Parma, V (CERN) ; Tückmantel, Joachim (CERN) et al.
The construction of a Superconducting Proton Linac is planned at CERN during the next decade. [...]
CERN-AB-2008-064.
-
2008. - 8 p.
Preprint
|
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
2008-10-03 11:34 |
Αναλυτική εγγραφή - Παρόμοιες εγγραφές
|
|
|