2008-08-14 16:25 |
CV equipment responsibilities
/ Pirollet, B
This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. [...]
CERN-TS-Note-2008-044 ; EDMS950035.
-
2008. - 3 p.
|
Detailed record - Similar records
|
2008-08-14 16:09 |
Detailed record - Similar records
|
2008-08-11 15:52 |
Detailed record - Similar records
|
2008-08-11 15:49 |
Detailed record - Similar records
|
2008-08-08 11:32 |
Experience with the infrastructure systems during the commissioning of the LHC
/ Saban, R (CERN)
The commissioning activity which started in October 2005 consists in the short circuit tests, the commissioning of the non cryogenic systems and the finally the powering tests of the superconducting components of the LHC. During all theses phases, the infrastructure systems are brought into operation, their performance assessed and validated for the routine operation of the collider. [...]
CERN-TS-Note-2008-040; EDMS936665.-
Geneva : CERN, 2008 - 8 p.
External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.233-240
|
Detailed record - Similar records
|
2008-08-08 11:30 |
Coordination of the installation and of the commissioning of the machine [LHC]
/ Foraz, K (CERN)
The installation of the LHC machine is now finished, and the powering tests are on-going. Since the start of the civil engineering works in 1998, a lot of installation works and tests had been performed by different groups and departments, by different type and size of contracts, and with different technologies. [...]
CERN-TS-Note-2008-039; EDMS936664.-
Geneva : CERN, 2008 - 7 p.
External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.227-232
|
Detailed record - Similar records
|
2008-08-08 11:29 |
Detailed record - Similar records
|
2008-08-08 11:08 |
Interventions mécaniques d'urgence pour le LHC
/ Folch, R (CERN) ; Atieh, S (CERN)
/MME
Si la plupart des équipements du LHC ont pu être installés dans des conditions maîtrisables, certains objets ont nécessité une forte mobilisation du département TS afin de surmonter les difficultés rencontrées par les responsables de ces équipements et parvenir à respecter le planning. Cette présentation propose de revenir sur ces situations de crise atypiques pour mieux en comprendre les enjeux, les leçons et les formules gagnantes à retenir. [...]
CERN-TS-Note-2008-037; EDMS936660.-
Geneva : CERN, 2008 - 7 p.
External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.211-226
|
Detailed record - Similar records
|
2008-08-08 11:05 |
Detailed record - Similar records
|
2008-08-08 11:02 |
Quality procedures for electronics production
/ Magnin, B
Qu'elles soient réalisées en pièces uniques ou en petites séries, les cartes électroniques dessinées et produites par DEM devront garantir le fonctionnement de la machine et des expériences pendant une vingtaine d'années, tout en étant difficilement accessibles en cas de défaillance. [...]
CERN-TS-Note-2008-035.
-
2008. - 0 p.
|
Detailed record - Similar records
|
|
|